tothetheoreticalof ofinduced and According analysisgenerationprocess overvoltage modelusedin builds circuit model
parameter simulation,this and paper appropriateparameter currentmodel.Thenitsimulatesand the of strikestowers
lightning analyzesprocesslightning
used Aided orderto the PSCAD(PowerSystemComputerDesign)inimprove lighting level.Inthe the
resisting simulation,itsimulates is primarily following
no thelineinsulationandinstalloverheadwireand measures,enhance protection ground
arrestorswithdifferent thesimulationresultsand in groundingresistance.Though monitoring obtainsthemeasuresof the of
field,it improve levellines.Theresearchof lightingresisting
thisthesisisofinstructional to theoverheaddistributionlines舶m significanceprevent
lightning. distribution induced offset Keywords:Overhead需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:200
需要金币:240
需要金币:40
需要金币:120
需要金币:100
需要金币:90
需要金币:100
需要金币:150
需要金币:180
需要金币:120